Projects

Brentwood Fire Dept
New out of the ground, three bay fire station for the Brentwood FD....
LEARN MORE

ExtraSpace Storage, Huntington Station NY
The 3 story + basement- 85,056 -square-foot self-storage facility Construction with 658 fully climate-controlled various-size storage units. Building contains * Two...
LEARN MORE

Brookhaven Logistics Center
The Brookhaven Logistics project successfully delivered three state-of-the-art warehouses totaling 550,000 square feet on an 81-acre site in the Long...
LEARN MORE

Life Storage – Bay Shore
Three story, 105,000 sq. ft. (906) Storage units (2) Auto Sliding Door Loading Bays (2) Hydraulic Elevators (2) Stair Towers...
LEARN MORE

Extra Space Storage- Hempstead
The 7-story, 155,000 square-foot self-storage facility at 46 Greenwich St. in Hempstead, NY, was delivered for LSC Development. Extra Space...
LEARN MORE

Riverhead Charter School
Complete renovation of the early 1900s Northville schoolhouse for use as the High School for the Riverhead Charter School. Renovations...
LEARN MORE

Amazon Fresh Warehouse, Red Hook, Brooklyn NY
New 89,000 sq. ft out of the ground warehouse covering one city block, including a mezzanine, with five loading bays....
LEARN MORE

ExtraSpace, Bohemia NY
General Contractor – Storage Out-of-the-ground two-story storage facility with 576 units, including 56 drive-up units. ...
LEARN MORE

Life Storage – Glen Head, NY
New out-of-the-ground 3-Story Self Storage Facility 101,000 SF within Town of Glen Head, Village of Oyster Bay, composed of 930...
LEARN MORE

Lindenhurst Memorial Library
The $9.9m community-funded bond provided a complete renovation of their 23,000 SF building and added another 3,000 SF; reworking the...
LEARN MORE

Mineola Fire Dept HQ
Construction of a new out-of-the-ground Headquarters for the Mineola Fire Department Three-story, 28000 sq. ft., elevator-equipped building with seven apparatus...
LEARN MORE

Extra Space Storage – Farmingville NY
New 98,208 square foot, 2-story, climate-controlled self-storage facility in the Hamlet of Farmingville in Suffolk County on Long Island....
LEARN MORE

Public Storage – Port Jefferson, NY
87,510 gross square foot climate-controlled self-storage facility in the Hamlet of Port Jefferson Station in Suffolk County on Long Island. ...
LEARN MORE

Public Storage – Holbrook NY
Conversion/Expansion of existing commercial building to a climate-controlled two-story storage facility with 759 units and the construction of four one-story...
LEARN MORE

Village by the Bay Apartments
Amityville, NY ~100,000 Sq. FT. building with 115 units comprised of studios, 1br, and 2br units. Common area amenities include...
LEARN MORE

Hempstead UFSD
Replacing a 93-year-old elementary school that was closed in 2004, with a new three-story 76,000 Sq FT. out of the...
LEARN MORE

ExtraSpace Storage, Glen Cove
New out of the ground Three-story building totaling 108,000 Sq. FT. with a total of 934 units, 20 exterior units,...
LEARN MORE

Advantage Storage, Arvada CO
New 95,400 sq. ft. self-storage facility consisting of (1) 46,275 Sq. Ft. 3-story climate-controlled building with (4) single-story exterior drive-up...
LEARN MORE

Springs UFSD
$22,000,000 Bond Issue to support facilities upgrades including the first of its kind on Long Island Effluent Water Treatment Leaching...
LEARN MORE

Malverne Union Free School District
$29,000,000 bond issue to improve the HS athletic fields and the construction of a new, out of the ground, state-of-the-art...
LEARN MORE

ExtraSpace Storage, Yaphank NY
3 Single story buildings totaling 94,128 SF with 675 total units. This includes 130 non-conditioned exterior units and 545 interior...
LEARN MORE

Middle Island NY Storage Facility
New out-of-the-ground two-story 82,000 SF Storage Facility w/ 643 Units and Two Single Story Buildings – 8,400 SF with 56...
LEARN MORE

Men on the Move – Addition, Woodbury NY
New out of the ground 90,000 sq ft, three-story building, plus basement attached to an existing building, creating 14,000 sq...
LEARN MORE

Bayport-Blue Point Public Library
$16.8m Bond vote passed on December 6, 2018, Ribbon cutting December 18, 2021...
LEARN MORE

Patchogue-Medford UFSD $176,000,000
Bonds approved for $149,000,000 + $11,000,000 Excel + $11,000,000 Energy Performance Contract + $5,000,000 Roof replacement...
LEARN MORE

Kings Park Central School District $67,000,000
Bonds approved for $26,000,000 + $41,000,000...
LEARN MORE